A simple and effective solution is the use of pre-loading or surcharge loading. Pre-loading involves placement of load on the ground surface prior to construction such that the imposed load is equivalent to the final project loading conditions.

What does it mean to surcharge a site?

ABSTRACT. A surcharge load is any load such as spoil embankments, streets or highways, construction machinery which is imposed upon the. surface of the soil close enough or distance to the excavation. This load causes a lateral pressure to act on the system in addition to. the basic earth pressure.

What is preloading in ground improvement?

Preloading is an economical and effective soil improvement method that can reduce settlement and increase the bearing capacity of soft soil. In other words, preloading accelerates settlement of the soil before the construction of the structure.

What is surcharge road construction?

Surcharge load is used to expedite the consolidation of the soft soil where the backfill soil is placed on top of soft soil for a certain period of time. The consolidation is the process to drain out water from the soft soil.

What is surcharge on retaining wall?

A “surcharge” on a retaining wall is any load in addition to level grade, within that area defined by a 45 degree angle from the bottom of the footing to level grade.

What is surcharge in civil engineering?

Surcharge is the additional load on the soil which may be created due to any overlying structure or any moving object.

How is preloading done?

The threads of the nut work with the threads of the screw to apply force to either side of the fastened material. This tension is called Bolt Preload, which is the compression created as the nut is tightened against the bolt (or vice-versa).

What is the principle of preloading?

The principle of preloading, illustrated in figure 1, postulates the consolidation settlement of initial soil is reduced before the construction of real project (with applied load 0 P ) when preloading is applied with allowable stress 1 0 P P  .

Does preloading with a surcharge reduce secondary settlement?

However, preloading with a surcharge is required to produce sufficient preconsolidation with respect to the final permanent structure load in order to also reduce secondary settlement. Secondary settlement without surcharging is especially significant when duration of primary consolidation t p is small and secondary compression index C α is large.

What is pre-loading or surcharge loading?

A simple and effective solution is the use of pre-loading or surcharge loading. Pre-loading involves placement of load on the ground surface prior to construction such that the imposed load is equivalent to the final project loading conditions.

What is pre-loading in civil engineering?

Pre-loading involves placement of load on the ground surface prior to construction such that the imposed load is equivalent to the final project loading conditions. Sufficient time is then allowed for the ground to settle and strengthen as consolidation occurs under the imposed load.

Does surcharging reduce secondary settlement of clay and peat deposits?

In other words, although surcharging can reduce post-construction secondary settlement for both clay and peat deposits, surcharging is less effective for peats. Secondary settlement of soft clay, silt and peat deposits, with or without surcharging, is completely consistent with the C α /C c law of compressibility.