Is Purvanchal Express running?

Is Purvanchal Express running?

Purvanchal Express operates daily 4 days in a week – Monday,Tuesday,Thursday,Saturday, with continues services.

How much is the toll on the Purvanchal Expressway?

Rs 300 is charged for two wheelers and tractors, Rs 600 for cars and jeeps and Rs 945 for low commercial vehicles as tolls. Special security arrangements have been made on the highway which is about 300 km long.

Is Purvanchal Expressway ready?

The project has to be completed in 36 months and the deadline is October 2021. The inauguration of this expressway has been completed on November 16, 2021 by Hon’ble Prime Minister at Kurebhar-Airstrip, district-Sultanpur. As per executed agreements, the due date for COVID-19 completion is October 2021.

Can we travel on Purvanchal Expressway?

Purvanchal Expressway is a 340.8 km long, 6-lane wide (expandable to 8) access-controlled expressway in the state of Uttar Pradesh, India….

Purvanchal Expressway
Existed 16 November 2021–present
Major junctions
West end Chand Saray village, Lucknow district
East end Haydaria village, NH-31, Ghazipur district

Is it safe to travel on Purvanchal Expressway?

Travelling through the Purvanchal Expressway even at night will be safe because elaborate security arrangements have been put in place. Police outposts have been constructed at various places along the Expressway.

Can I travel on Purvanchal Expressway?

Purvanchal Expressway is a 340.8 km long, 6-lane wide (expandable to 8) access-controlled expressway in the state of Uttar Pradesh, India….

Purvanchal Expressway
Length 340.824 km (211.778 mi)
Existed 16 November 2021–present
Major junctions
West end Chand Saray village, Lucknow district